Completed projects

Eighteen Oxford - 9 lot Residential Development

Eighteen Oxford was a 9-lot residential development on a busy street in Tawa by Developers Urban Company. 


Our scope of work:

-Removal of asbestos 

- Demolish the existing large leaky house - Complete the earthworks

- Install drainage, water and services   

- Preparation for slabs 

- Install of all concrete surfacing prior to the homes being built

- Complete house drainage and connections

- Install all fencing

- Complete all landscaping and gardening

- Install letter boxes and bike rack


High Street, Boulcott - 13 lot Residential Development

High Street- Boulcott


High Street was a development by Lower Hutt Developer Rudy van Baarle.


MRGs Contract included:

Taking over site from Demo team

Site cut and Earthworks

Drainage, Water and Services

Prep and Pour Vehicle Crossing

Prep and Pour Right of Way and Kerbing. 

Prepare slabs

Prep and pour all scribed concrete patios

Install all fencing

Establish garden beds


Redwood School - New Playground

Redwood School Playground Upgrade


This playground upgrade was completed in conjunction with Playground Creations with the majority of the work completed while the children were still at school adding an interesting dynamic to the teams on the ground. 


MRG's Scope included:

- Site environmental and security

- Demolition of existing playground

- Site cut and extension for new playground area

- Trucking

- Dig and drill all footings and piles for new playground set out

- Install boundary framing to playground area

- Install safety wood chip for fall from heights


 



Raukawa Heights - 33 lot Residential Development

Raukawa Heights


Raukawa Heights was a large complex development completed by MRG Property. The Civils component of this job was very complex with multiple trades working on site to get it completed.     


MRG Civils Scope included:

- Backfilling retaining walls

- Preparing all roading and right of ways

- Installing subsoil drainage

- Preparing and installing all Kerb and Channel into roading sumps

- Installing Roading and right of ways

- Preparing and installing vehicle crossings

- All fencing, landscaping, patios, minor retaining walls


Main Road - Titahi Bay

Main Road


Main Road was a 9-lot infill development of an old bus depot. 


MRG Civil had the contract for:

- Asbestos Removal and Demolition

-Site clearance and earthworks

- 3 waters drainage and connections

- Services install

- Fencing

Prepping and Installing Concrete Right of Ways

Concrete Patios

Ohariu Valley - House Build

Ohariu Valley New Home


Ohariu Valley is a lifestyle block where our clients removed their existing home and rebuilt their new home. 


MRG Civils Scope:

- Complete final stages of demolition

- Site cut and install retaining wall

- Build up gravel raft for slab

- Prepare slab

-Install large landscape batter

-Cut in new driveway

- Prepare and place new 200m2 exposed aggregate parking area

- Complete long rotor millings driveway down to the gate. 

Barberry Grove - 6 lot Residential Development

Barberry Grove - 6 lot Residential Development

Barberry Grove - 6 lot Residential Development

Barberry Grove


Barberry Grove was a 6 lot development in Maungaraki. It was completed around keeping and existing home with tenants living in it. 


Our Scope:

- Earthworks

- Retaining

- Fencing

- Surfacing, concrete ROW

- Paving/Gobi Blocks

- Kerbing

- Vehicle Crossings

- Landscaping

  • Privacy Policy

MRG Civil

Copyright © 2025 MRG Civil - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept